PROJECTS

REFERENCES

We have worked with some of the biggest brands

TEMPORARY KITCHEN IN LEHRTE

Edeka Supermarket

SPECIFICATIONS

TEMPORARY DISHWASHING KITCHEN IN LEBACH

Bundeswehr

SPECIFICATIONS

  • 36m²
  • Dishwashing area
  • Construction time: 1 day
  • Rental period: 91 weeks
  • Turn Key Delivery
  • 2 Modular NxtGen units each 18m²

TEMPORARY KITCHEN IN NÜRNBERG

 

SPECIFICATIONS

 

TEMPORARY KITCHEN IN SCHÖNAU

Hospital

SPECIFICATIONS

  • 129.6m²
  • Hot kitchen, dishwashing area, cold kitchen, and refrigeration/freezer spaces.
  • Construction time: 2 days
  • Rental period: 17 weeks
  • Delivered “Turn Key”
  • 6 “Classic” unit modules each 21.6m²

DINING AND DRINKING AT FIFTY METERS HEIGHT

Amsterdam RAI

SPECIFICATIONS

  • 36 m²
  • Hot kitchen and dishwashing area.
  • Construction time: 1 day
  • Rental period: 3 months
  • Delivered “Turn Key”
  • 2 High Tech units of the NxtGen Kitchens Construction System, each 18 m²

PROJECT TEMPORARY CANTEEN IN LEHRTE

TenneT

SPECIFICATIONS

  • 375 m²
  • Construction time: 8 weeks
  • Rental period: 24 months
  • Delivered “Turn Key”
  • Kitchen and restaurant in modular NxtGen building

PROJECT TEMPORARY KITCHEN BERLIN

Nursing home

SPECIFICATIONS

 

PROJECT TEMPORARY KITCHEN DRESDEN

 

SPECIFICATIONS

 

PROJECT TEMPORARY KITCHEN AND RESTAURANT VECHTA

University

SPECIFICATIONS

 

PROJECT TEMPORARY KITCHEN IN PRIEN

Nursing home

SPECIFICATIONS

  • 324 m² modular temporary kitchen
  • Capacity: minimum 700 meals per day
  • Assembly time: 5 days
  • Rental period: 26 weeks
  • “Turn Key” delivered
  • 18x “NxtGen Kitchen” modules of 6x3m

PROJECT TEMPORARY KITCHEN IN HEILBAD HEILIGENSTADT

Hotel

SPECIFICATIONS

 

PROJECT TEMPORARY KITCHEN IN DUDENHOFEN

Senior residence

SPECIFICATIONS

  • 108m² modular temporary kitchen (2x 54m²)
  • Construction time: 3 days
  • Rental period: 3 months
  • “Turn Key” supplied
  • 6 High Tech units of the NxtGen kitchens building system of 18m²

PROJECT TEMPORARY KITCHEN AND RESTAURANT IN KIRCHDORF

Manufacturing company

SPECIFICATIONS

  • Total area 450 m² of which 150 m² kitchen and 300 m² restaurant
  • Assembly time: 8 weeks
  • Rental period: 36 months
  • “Turn Key” delivered
  • 9 glass panels of 235 x 200 cm for extra daylight and comfort

PROJECT TEMPORARY KITCHEN AND RESTAURANT IN KREFELD

Elementary school

SPECIFICATIONS

 

TEMPORARY KITCHEN PROJECT IN CHEMNITZ

 

SPECIFICATIONS

  • 126m² modular temporary kitchen
  • Fine-tuned modern design
  • Construction time: 2 days
  • Rental period: 13 weeks
  • “Turn Key” supplied
  • 7 High Tech units of the NxtGen kitchens building system of 18m²

THE PATH TO YOUR
SOLUTION IS HERE