PROJECT NÜRNBERG
Temporary kitchen
NÜRNBERG
108M²
2 DAYS
34 WEEKS
PROJECT
108M²
2 DAYS
34 WEEKS
At the request of a contractor, we were allowed to install a professional temporary kitchen in Nuremberg (Germany), consisting of 6 NxtGen kitchen units. Integrated features included a hot kitchen, cold kitchen, and spaces for refrigeration, freezing, and dry storage.
The kitchen is rented for 34 weeks by a residential care facility for disabled individuals during the renovation of their existing kitchen.
Specifications
- 108m² modular temporary kitchen
- Tailored modern design
- Construction time: 3 days
- Rental period: 34 weeks
- Delivered ‘Turn Key’
- 6 High Tech units from the NxtGen kitchens building system, each 18m²
Special features & technologies
- Hot, cold, and dishwashing kitchen with refrigeration and freezing space
- Optimal utilization of available space
- The entire kitchen is equipped with an R-12 anti-slip floor
- Ready for use after only 2 assembly days
- Includes grease separator compliant with NEN 7 and dirty water pump
NxtGen kitchens units
- Interior walls made of stainless steel
- Flexibility in terms of layout and equipment
- Dispensers for soap and disinfectant
- Installation is possible in almost any location
- Personal advice and project guidance
- Fast and efficient construction method