PROJECT NÜRNBERG

Temporary kitchen
NÜRNBERG
108M²
2 DAYS
34 WEEKS

PROJECT

NÜRNBERG
108M²
2 DAYS
34 WEEKS

At the request of a contractor, we were allowed to install a professional temporary kitchen in Nuremberg (Germany), consisting of 6 NxtGen kitchen units. Integrated features included a hot kitchen, cold kitchen, and spaces for refrigeration, freezing, and dry storage.

The kitchen is rented for 34 weeks by a residential care facility for disabled individuals during the renovation of their existing kitchen.

Specifications

  • 108m² modular temporary kitchen
  • Tailored modern design
  • Construction time: 3 days
  • Rental period: 34 weeks
  • Delivered ‘Turn Key’
  • 6 High Tech units from the NxtGen kitchens building system, each 18m²

Special features & technologies

  • Hot, cold, and dishwashing kitchen with refrigeration and freezing space
  • Optimal utilization of available space
  • The entire kitchen is equipped with an R-12 anti-slip floor
  • Ready for use after only 2 assembly days
  • Includes grease separator compliant with NEN 7 and dirty water pump

NxtGen kitchens units

  • Interior walls made of stainless steel
  • Flexibility in terms of layout and equipment
  • Dispensers for soap and disinfectant
  • Installation is possible in almost any location
  • Personal advice and project guidance
  • Fast and efficient construction method